134th Ave Sidewalk Improvements

Location: 134th Ave. NE from NE 75th St. to NE 80th St.

Project Phase: Design

Estimated Timeline: Construction is set to begin March 26, 2018, and be completed by the end of September 2018

Project Manager: Bassam Al-Ali, 425-556-2743

Page Last Updated: 03/13/18

As part of the Safe Routes to School program, the City of Redmond is designing a complete sidewalk on the east side of 134th Ave NE from NE 75th St. to NE 80th St. The project includes sidewalk, lighting and a flashing beacon pedestrian crossing at NE 80th St.

134th Ave Sidewalk Project Location Map